济南蓬发建材有限公司为您提供临边护栏、木工防护栏、工程围挡等相关信息发布和相关资讯,敬请关注!
新闻
联系我们
咨询电话
15866735826

联系:张经理

手机: 15866735826

邮箱: 394441862@qq.com

网址://www.hongdaxinwuliu.com/

地址:山东省济南市章丘圣井工业园

当前位置: 首页 > 新闻中心 > 行业动态

钢筋加工棚的8点安装事项

来源://www.hongdaxinwuliu.com/   发布时间:2023-02-17

钢筋加工棚是施工现场钢筋调直、弯曲和焊接的场所。钢筋加工棚我们来看看是怎么装的。
The reinforcement processing shed is the place for reinforcement straightening, bending and welding at the construction site. Let's see how to install the reinforcement processing shed.
1、埋设预埋件(预埋件包含在单柱钢棚内,双柱安装使用膨胀螺丝)
1. Embedded parts (embedded parts are included in single-column steel shed, and expansion screws are used for double-column installation)
2、将主梁与立柱连接器对接,(不要拧14个螺丝),钢筋加工棚先将斜撑安装在上斜撑上(用14个螺丝)。否则,支架的孔没有对齐。
2. Connect the main beam with the column connector (do not tighten 14 screws), and install the diagonal brace on the upper diagonal brace (use 14 screws) in the reinforcement processing shed. Otherwise, the holes of the bracket are not aligned.
3、安装主梁(单柱主梁为140工字钢和50方管焊接框架,双柱主梁为50方管焊接框架)与柱之间的连接件(14个螺钉)。
3. Install the connections (14 screws) between the main beam (140 I-beam and 50 square tube welded frame for single-column main beam, and 50 square tube welded frame for double-column main beam) and the column.
4、用叉车或吊车将立柱吊起安装,间距3米(单柱单柱为200工字钢,双柱为100方管)。钢筋加工棚安装时,确保立柱的腰线在中间3米。方管柱底盘通过20*180膨胀螺栓与预埋件连接,H型钢柱。
4. Use a forklift or crane to lift and install the columns with a spacing of 3 meters (single column and single column are 200 I-beams, and double columns are 100 square tubes). When installing the reinforcement processing shed, ensure that the waist line of the column is 3 meters in the middle. The square pipe column chassis is connected with the embedded parts through 20 * 180 expansion bolts, and H-shaped steel column.
钢筋加工棚
5、安装侧梁(50方管焊接框架),两边用10×12螺钉,中间用10×18螺钉。
5. Install the side member (50 square tube welded frame) with 10 on both sides × 12 screw, 10 in the middle × 18 Screw.
6、安装檩条,底层6个2.99米钻尾,钢筋加工棚4个2.94米夹角铁,装上。
6. Install purlins, six 2.99m drilled tails at the bottom, and four 2.94m angle iron clips at the top of the reinforcement processing shed, and install them.
7、设置彩钢屋面,彩钢板尺寸为1.14*3.0米,中间每隔3米,在柱的左右两侧放置三块彩钢板,钢筋加工棚彩钢板通过钻尾丝与下檩条连接。
7. The color steel roof is set. The size of the color steel plate is 1.14 * 3.0m, and three color steel plates are placed on the left and right sides of the column every 3m in the middle. The color steel plate of the reinforcement processing shed is connected with the lower purlin through the drilling tail wire.
8、四面安装广告布,用钻尾丝打边梁和主梁。
8. Install advertising cloth on all sides, and punch the side beam and main beam with drilling thread.
钢筋加工棚的施工规范是日常建筑施工中必不可少的。这种规范可以给我们带来放心,保证建筑的牢固性。更多相关内容就来我们网站//www.hongdaxinwuliu.com咨询!
The construction specification of reinforcement processing shed is indispensable in daily construction. This kind of specification can give us reassurance and ensure the firmness of the building. Come to our website for more relevant content //www.hongdaxinwuliu.com consulting service

Baidu
map