搭设钢筋加工棚,你需要知道哪些事?
钢筋加工棚从字面上来看,就知道是在施工现场内,对钢筋进行拉直、弯曲、焊接等加工作业的场地。为了满足施工需求,钢筋加工棚一般布置在既方便进料、又在塔吊佳起重覆盖范围内,便于钢筋的存放与加工,还方便后期出入库搬运、吊运。那么搭设钢筋加工棚,你需要知道哪些事?
The reinforcement processing shed literally means that it is the place where the reinforcement is straightened, bent, welded and other processing operations are carried out on the construction site. In order to meet the construction requirements, the reinforcement processing shed is generally arranged within the range of convenient feeding and tower crane, so as to facilitate the storage and processing of reinforcement, as well as the warehousing and transportation in the later period. So what do you need to know about setting up the steel bar processing shed?
现有技术的钢筋加工棚一般为钢管搭设式的,利用扣件将多根钢管扣接搭设成加工棚的整体式钢结构,每根连接加固钢管的两端分别固定在构成钢骨架的两根钢管之间,再在顶部铺设一层彩钢板,节点部位均采用螺栓连接,高度和长度可灵活调节、配制,并具有可拆卸性的特点,可长期循环利用。
The steel bar processing shed in the prior art is generally of the steel pipe erection type. A plurality of steel pipes are buckled and erected into an integral steel structure of the processing shed by using fasteners. The two ends of each connected and reinforced steel pipe are respectively fixed between the two steel pipes forming the steel skeleton, and then a layer of color steel plate is laid on the top. The nodes are connected by bolts. The height and length can be flexibly adjusted and configured, and are removable, which can be recycled for a long time.
然后在钢结构的四根钢管横梁上焊接多根竖直向钢管,再用与钢管横梁平行的水平向钢筋与同一排的竖直向钢管通过扣件扣接固定,就构成了防坠落保护栏杆,后挂上标语横幅,整个钢筋加工棚就施工完毕,通过高压焊接,做到牢固不开焊,坚固耐用,静电喷涂,防腐防锈,5年不褪色。
Then, several vertical steel pipes are welded on the four steel pipe beams of the steel structure, and then the horizontal steel bars parallel to the steel pipe beams are fastened with the vertical steel pipes in the same row through fasteners to form a fall protection railing. After that, a safety banner is hung, and the entire steel bar processing shed is completed. Through high-pressure welding, it is firm and durable, with electrostatic spraying, anti-corrosion and rust prevention, and it will not fade for 5 years.
钢筋加工棚长和宽的尺寸,需要按照建筑施工防护标准进行设计,根据施工现场钢筋加工数量和使用机械的多少来确定钢筋加工棚的大小,一般需要根据施工计划,安置钢筋对焊机、切断机、弯曲机、调直机等设备的数量及加工流水线;还需考虑部分钢筋原材料、加工后钢筋的周转及堆放;以及现场施工场地、用电等条件来确定。
The length and width of the steel bar processing shed shall be designed according to the building construction protection standards. The size of the steel bar processing shed shall be determined according to the number of steel bars processed on the construction site and the number of machines used. Generally, the number of steel bar butt welding machines, cutting machines, bending machines, straightening machines and other equipment and processing lines shall be arranged according to the construction plan; It is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; And the site construction site, electricity and other conditions.
所以钢筋加工棚一般跨度在12~18m,,长度尽可能大于30m,一般情况有6*12m、9*12m等几种,根据现场具体情况酌情采用,也可自行设计长宽尺寸,满足24小时施工,有效节约施工成本。您有什么疑惑或者需求可以随时来我们网站//www.hongdaxinwuliu.com进行咨询!
Therefore, the span of the reinforcement processing shed is generally 12~18m, and the length should be greater than 30m as much as possible. Generally, there are 6 * 12m, 9 * 12m and other types of sheds. They can be used according to the specific situation on site, or they can design their own length and width to meet the 24-hour construction requirements and effectively save construction costs. If you have any doubts or needs, you can come to our website at any time //www.hongdaxinwuliu.com Consult!