济南工地钢筋加工棚如何搭设?

来源://www.hongdaxinwuliu.com/   发布时间:2022-03-16

1、木工加工棚工地钢筋加工棚搭设规范:

1. Specification for erection of reinforcement processing shed on site:
钢筋加工棚是施工现场内对钢筋进行拉直、弯曲、焊接等钢筋加工作业的一个场地。钢筋加工棚的长和宽,一般会根据钢筋加工数量和使用机械的多少确定加工棚的大小,一般情况有6*12m、9*12m、18*30m等几种,可以根据施工实际情况,自行设计长与宽尺寸。钢筋加工棚工作台的布置也要合理,根据真实钢筋加工流程来,还有加工前原材料钢筋和加工结束后成品的存放,所以钢筋加工棚的地面应高于施工场地地面30cm,防止雨水浸泡,用脚手管进行搭设时,应有地横杆和斜撑,以保证加工棚的稳定性。
The reinforcement processing shed is a site for straightening, bending, welding and other reinforcement processing operations on the construction site. The length and width of the reinforcement processing shed are generally determined according to the number of reinforcement processing and the number of machines used. Generally, there are 6 * 12M, 9 * 12M, 18 * 30m and other types. The length and width dimensions can be designed according to the actual construction situation. The layout of the worktable of the reinforcement processing shed should also be reasonable. According to the real reinforcement processing process, as well as the storage of raw materials and finished products before processing and after processing, the ground of the reinforcement processing shed should be 30cm higher than the ground of the construction site to prevent rainwater immersion. When erecting with scaffold pipes, there should be ground cross bars and diagonal braces to ensure the stability of the processing shed.
2、工地钢筋加工棚搭建细节:
2. Construction details of reinforcement processing shed on site:
埃欧哲钢筋加工棚采用国际标准钢材制作,在现场利用扣件将多根钢管扣接搭设成加工棚的整体式钢结构,再设置斜撑和双层防砸结构,校验钢结构强度是否符合设计要求,在栏杆上钩挂标语横幅,整个钢筋加工棚施工完毕标准化设计。全拼装式,快速组装,拆卸简单,方便运输,型材及配件规格可按需求来定制。同时地面也需要硬化,立柱基础浇筑700*700*700mm混凝土,预埋300*300*12mm钢板。
The eozhe reinforcement processing shed is made of international standard steel. Firstly, a number of steel pipes are buckled and erected on site to form an integral steel structure of the processing shed, and then diagonal bracing and double-layer anti smashing structure are set to verify whether the strength of the steel structure meets the design requirements. Safety slogans and banners are hung on the railings, and the construction of the whole reinforcement processing shed is completed with standardized design. Fully assembled, quick assembly, simple disassembly and convenient transportation. The specifications of profiles and accessories can be customized according to demand. At the same time, the ground also needs to be hardened. The column foundation is poured with 700 * 700 * 700mm concrete and embedded with 300 * 300 * 12mm steel plate.
3、工地钢筋加工棚需注意事项:
3. Precautions for reinforcement processing shed on site:
1.一般情况下,钢筋加工棚都在塔吊的吊运范围内,否则钢筋吊动不方便,同时必须设置双层硬质防护,棚的具体尺寸要根据实际情况来定。
1. Generally, the reinforcement processing shed is within the lifting range of the tower crane, otherwise it is inconvenient to lift the reinforcement. At the same time, double-layer hard protection must be set, and the specific size of the shed should be determined according to the actual situation.
2.防护棚的顶有二层的,上面的隔层上铺模板,下面一层铺二层竹芭片子,二层之间间距500 mm。
2. If there are two layers on the top of the protective shed, the upper compartment is paved with formwork, and the lower layer is paved with two layers of bamboo flakes, with a spacing of 500 mm between the two layers.
3.工具式钢筋加工棚需在醒目处挂操作规程图牌和宣传用语的横幅,图牌的尺寸为:宽×高=2000mm×1000mm,横幅宽度宜为1m。
3. The tool type reinforcement processing shed shall hang the operation specification drawing board and the banner of safety publicity language at the eye-catching place. The size of the drawing board is: width × Height = 2000mm × 1000mm, and the width of the banner should be 1m.
4.加工车间地面需硬化,宜选用砼地面。
4. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
5.内部有灭火器、钢筋加工设备、有照明系统
5. There are fire extinguishers, reinforcement processing equipment and lighting system inside
6.加工车间地面需硬化,宜选用砼地面。
6. The ground of the processing workshop needs to be hardened, and the concrete ground should be selected.
7. 南方地区,如遇台风应采取防风措施,可设置缆风绳
7. In the south, in case of typhoon, windproof measures shall be taken, and wind ropes can be set