在加工棚拆除前须进行技术交底!
在施工过程中搭建木工加工棚一定要注意做好防护措施,施工人员一定要按照施工要求进行施工。露天的搅拌机位置,现场混凝土搅拌机、卷扬机棚、钢筋棚、木工棚以及一些出入口,现场厕所需要等都需要搭设木工加工棚。由于建筑使用的木工加工棚增多,使得很多厂家都可以制作木工加工棚。
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Due to the increase of woodworking sheds used in buildings, many manufacturers can make woodworking sheds.
木工加工棚在建筑工地上是保护建筑施工材料的堆放、为了防止工地物品不受雨水淋湿导致生锈。 木工加工棚搭设完毕后,须经过专职员验收合格,方可投入使用。在加工棚搭设和拆除前,须进行技术交底。
The carpentry processing shed is used to protect the stacking of construction materials on the construction site, and to prevent the rusting of site items from being soaked by rain. After the carpentry processing shed is erected, it can only be put into use after passing the acceptance of the full-time safety officer. Before the erection and removal of the processing shed, safety technical disclosure must be carried out.
高处作业人员须经过技术培训及考试合格,持证上岗。木工加工棚采用的钢管、扣件等材料须符合技术规范及有关标准要求。搭设和拆除水平木工加工棚时,操作工人的“三宝”须齐备,且应正确使用。
High-altitude operators must receive professional technical training and pass the professional examination, and work with certificates. The steel pipes, fasteners and other materials used in the woodworking shed must meet the requirements of safety technical specifications and relevant standards. When erecting and dismantling the horizontal woodworking processing shed, the operators' "three treasures of safety" must be complete and used correctly.
在木工加工棚搭拆时,应避免上下同时作业,把操作时间错开。搭拆木工加工棚时,所有材料、工具应堆放在建筑物外边线以内少2m,堆码高度不超过1m。拆除的材料须传递到楼层内并及时运走,严禁高空抛掷。搭拆木工加工棚时,应在地面设置警戒区,并派专人监护。
When erecting and dismantling the woodworking shed, it is necessary to avoid working up and down at the same time and stagger the operation time. When erecting and dismantling the woodworking processing shed, all materials and tools shall be stacked at least 2m within the outer boundary of the building, and the stacking height shall not exceed 1m. The removed materials must be transferred to the floor and transported away in time. Throwing from high altitude is strictly prohibited. When erecting and dismantling the woodworking processing shed, a warning area should be set on the ground and a special person should be assigned to monitor it.
木工加工棚搭拆时,要有专人指挥。管理人员要做到:眼勤、腿勤、嘴勤,对危险情况要积极采取有效防护措施,确保人员。雨天、大风天气,暂停木工加工棚搭拆施工,并应检查维护木工加工棚的。
When erecting and dismantling the woodworking shed, a special person shall be assigned to command. The management personnel shall be diligent in eyes, legs and mouth, and actively take effective safety protection measures for dangerous situations to ensure personnel safety. In rainy and windy weather, the erection and dismantling of woodworking processing shed shall be suspended, and the safety of woodworking processing shed shall be checked and maintained.
在施工过程中搭建木工加工棚一定要注意做好防护措施,施工人员一定要按照施工要求进行施工。露天的搅拌机位置,现场混凝土搅拌机、卷扬机棚、钢筋棚、木工棚以及一些出入口,现场厕所需要等都需要搭设木工加工棚。您有需求就来我们网站//www.hongdaxinwuliu.com咨询吧!
During the construction process, when building the woodworking processing shed, attention must be paid to the safety protection measures, and the construction personnel must carry out the construction according to the construction requirements. The location of outdoor mixer, on-site concrete mixer, winch shed, reinforcement shed, woodworking shed and some entrances and exits, as well as the need for on-site toilets, all need to set up woodworking processing shed. Come to our website if you need //www.hongdaxinwuliu.com Ask!