济南蓬发建材有限公司为您提供临边护栏、木工防护栏、工程围挡等相关信息发布和相关资讯,敬请关注!
新闻
联系我们
咨询电话
15866735826

联系:张经理

手机: 15866735826

邮箱: 394441862@qq.com

网址://www.hongdaxinwuliu.com/

地址:山东省济南市章丘圣井工业园

当前位置: 首页 > 新闻中心 > 常见问题

工地防护栏需要如何安装?

来源://www.hongdaxinwuliu.com/   发布时间:2021-10-18

设备前要测量管线、地上处理(是置换或许夯实的情况)、基坑边坡、开挖、立柱暂时固定的方位、防护栏杆怎样设备、浇注混凝土基础、基坑围栏紧固、调整。测绘:依据图纸规划要求和实践地势、方针进行施工布置图,设置立柱中 心线,按规矩的斜度、线形设备护栏网。

Before the equipment, first measure the pipeline, ground treatment (in the case of replacement or compaction), foundation pit slope, excavation, the orientation of temporary fixing of columns, protective railing, pouring concrete foundation, fastening and adjustment of foundation pit fence. Surveying and mapping: carry out the construction layout according to the drawing planning requirements and practical terrain and guidelines, set the column centerline, and set the equipment guardrail according to the regular slope and alignment.
原始地基处理是确保护栏和整体稳定性的重要条件,为确保立柱的稳定性,需求替换和加固地基下的软层。柱设备部分,从纵剖面上看,柱轴线呈直线,不应呈现不均匀现象;从高处看,柱顶光滑,不应呈现不平的情况,特别地势在外。基准和白线是在调查和启航的基础上建立的。本来的地上被填满了,斜坡又被夯实了。
The original foundation treatment is an important condition to ensure the guardrail and overall stability. In order to ensure the stability of the column, it is necessary to replace and strengthen the soft layer under the foundation. For column equipment, from the longitudinal section, the column axis is a straight line and should not be uneven; From a high point of view, the top of the column is smooth and should not be uneven, especially the terrain is outside. The benchmark and white line are established on the basis of investigation and sailing. The original ground was filled and the slope was tamped again.
基坑开挖时设备放样方位,以确保基坑的巨细。在基坑立柱设备进程中,有必要确保柱的稳定性和与地基的紧密连接。在立柱设备进程中,选用小线段对立柱设备的直线进行测验,并对部分进行调整,确保直线段,曲线段滑润,立柱契合规划图纸要求。网格有必要与柱紧密连接,网面光滑平整,无明显的翘曲和突起。设备护栏后,应设备立柱,以确保设备的正确性和健壮性。
During the excavation of the foundation pit, the equipment setting out direction shall ensure the size of the foundation pit. In the process of foundation pit column equipment, it is necessary to ensure the stability of the column and the close connection with the foundation. In the process of column equipment, select small segments to test the straight line of column equipment, and adjust some parts to ensure that the straight line and curve segments are smooth, and the column meets the requirements of planning drawings. The grid must be closely connected with the column, and the grid surface is smooth and flat without obvious warpage and protrusion. After the equipment guardrail, the equipment column shall be installed to ensure the correctness and robustness of the equipment.
基坑护栏只要精 确健壮的设备后才能够有用维护施工安 全,所以设备前要做的准备工作也是尤为重要的,决不可粗心,详细的设备进程要看施工现场的实践情况来做抉择。
Foundation pit guardrail can effectively maintain construction safety only after accurate and robust equipment, so the preparation before equipment is also particularly important, and must not be careless. The detailed equipment process depends on the practice of the construction site.

Baidu
map